State of the College 2015

Facilities and Capital Improvements (Current)

Status

Total Budget ($)

Infrastructure Rehab Electrical Systems Rehab Mechanical Systems Minor Critical Maintenance

In construction

9.0 M

In design On-going

11.8 M

100 K/yr

Program Renovate 1 st Floor

Jan. 2015

5.5 M 2.5 M 1.6 M 450 K

Rehab Lecture Halls 101 & 103 Finished

Rehab Lecture Hall 206 Renovate Clinic Spaces Technology Electronic Health Record

In design On-going

Implementation

500K

Made with FlippingBook HTML5